REV 1.0
WRM-10P S2 USER’S MANUAL
41
d.
The following warning screen will be displayed:
Press any key to continue.
e.
The following screen will be displayed:
Press the
[START]
key.
f.
The following screen will be displayed:
This is only an informational screen to remind the operator that a test is in progress. The
display duration of this message depends on the size of the winding's inductance.
g.
The test begins as the magnetic field in the transformer ramps up to a stable plateau.
The following screen will be displayed when the transformer current stabilizes:
Manually run the regulator switch through all the contacts in its range. Press the
[STOP]
key to end the test.
TRANSIENT TEST
(Interval = 5 mSecs
Threshold = 2 )
RUN TAPS NOW...
** XFMR ENERGIZED! **
*XFMR CHARGING*
PLEASE WAIT...
TRANSIENT TEST
"START" TO RUN TEST
OR
"STOP" TO ABORT
**********WARNING**********
DANGEROUS FLASH-OVER
WILL OCCUR IF CABLES
ARE DISCONNECTED!
***************************
Содержание Vanguard Instruments WRM-10P S2
Страница 28: ...WRM 10P S2 USER S MANUAL REV 1 0 24 Figure 8 Typical V1 and V2 Test Report Printout with Multiple Readings ...
Страница 35: ...REV 1 0 WRM 10P S2 USER S MANUAL 31 Figure 9 Typical LTC Voltage Regulator Test Report Printout ...
Страница 47: ...REV 1 0 WRM 10P S2 USER S MANUAL 43 Figure 11 Typical Transient Test Report ...
Страница 65: ...REV 1 0 WRM 10P S2 USER S MANUAL 61 Figure 12 Typical Internal Test Record Directory Printout ...
Страница 67: ...REV 1 0 WRM 10P S2 USER S MANUAL 63 Figure 13 Typical USB Flash Drive Test Record Directory Printout ...