Using the Front Panel Interface
5-7
Preparing for the Initial ConÞguration
Before you start an initial conÞguration,
you need the required information
ready and should establish a method of record keeping.
Required Information
Collect the following information:
¥
The
DL600E
IP address
and
IP subnet mask
for establishing a
Telnet connection to the
DL600E unit
from a remote terminal
and enabling
SNMP
network management capability.
¥
One to three
NMS IP addresses
for enabling
SNMP
network
management capability
¥
Framing and line code requirements as speciÞed in the work
order from your service provider
Keeping a Record
You should keep a written record of each unitÕs conÞguration. Use the
ConÞguration Worksheet
found in Appendix A.
Содержание DL600E
Страница 1: ...DL600EE1 DataMultiplexer User s Guide...
Страница 2: ......
Страница 12: ...xiv DL600E E1 Data Multiplexer User s Guide...
Страница 14: ...xvi DL600E E1 Data Multiplexer User s Guide...
Страница 20: ...xxii DL600E E1 Data Multiplexer User s Guide...
Страница 26: ...1 6 DL600E E1 Data Multiplexer User s Guide...
Страница 34: ...2 8 DL600E E1 Data Multiplexer User s Guide...
Страница 102: ...5 26 DL600E E1 Data Multiplexer User s Guide...
Страница 113: ...Appendix A DL600E Technical Speci cations...
Страница 122: ...A 10 DL600E E1 Data Multiplexer User s Guide...
Страница 123: ...Appendix B Connector and Pin Assignments...
Страница 132: ...B 10 DL600E E1 Data Multiplexer User s Guide...
Страница 144: ...G 12 DL600E E1 Data Multiplexer User s Guide...