T002019
page 26
2.10.3 Putting the boiler into operation
This section details the procedure for putting the boiler into operation. There are 7
stages to the procedure:
1. Isolating the power supply and opening the front cover;
2. Checking the connections and making the boiler operational;
3. Switching the boiler on and setting the controls;
4. Checking/setting the gas/air ratio at full load;
5. Checking/setting the gas/air ratio at low load;
6. Making the boiler ready for use;
7. Instructing the user.
1.
Isolating the power supply and opening the front cover
•
Switch off the boiler at the fused spur and remove the fuse;
•
Remove the front panel - release the two screws at the bottom of the front
panel, pull the bottom of the panel towards you from the centre, making sure
that the plastic catch is released from the central display.
Содержание Avanta 12v
Страница 15: ...fig 05 Mounting the Avanta 59970 LT GB W7H 002 page 8 2 3 Water side connections 2 3 1 Water flow ...
Страница 34: ...fig 16 Connecting external controls R000158 A page 18 ...
Страница 35: ......
Страница 63: ...fig 42 Read out settings LT AL W7H 000 046 ...
Страница 68: ...fig 43 Change parameters in service level LT AL W7H 000 047 ...
Страница 70: ...fig 44 Change boiler output LT AL W7H 000 048 ...
Страница 87: ...fig 59 Assembling the boiler 59970LTGBW7H031 page 44 4 ERRORS 4 1 General ...
Страница 96: ......
Страница 99: ...fig 62 Exploded view Remeha Avanta 59970EVGBW7H010 ...
Страница 108: ...page 60 ...
Страница 109: ...page 61 ...