appear during this time, the boiler will then start to run if called for by the
controls.
•
The boiler now starts to run. The operational status is shown in the display.
Combustion checking/setting must be carried out by a competent person. It
must not be carried out unless that person is equipped with a combustion
analyser which conforms to the relevant British Standards.
fig. 37 Power on and controls on heat demand
R000165-A
4.
Setting the gas/air ratio at full load
The Avanta boilers are suitable for both natural gas and propane firing (restrictor
required for propane not supplied). The boilers are supplied as standard set for
natural gas (G20), therefore the following procedure must be carried out BEFORE
the boilers are fired and commissioned for the first time on propane:
- fit restrictor (instructions supplied);
- adjust the fan speed (for procedure see
, for values
- adjust the gas/air ratio (for values see
Содержание Avanta 12v
Страница 15: ...fig 05 Mounting the Avanta 59970 LT GB W7H 002 page 8 2 3 Water side connections 2 3 1 Water flow ...
Страница 34: ...fig 16 Connecting external controls R000158 A page 18 ...
Страница 35: ......
Страница 63: ...fig 42 Read out settings LT AL W7H 000 046 ...
Страница 68: ...fig 43 Change parameters in service level LT AL W7H 000 047 ...
Страница 70: ...fig 44 Change boiler output LT AL W7H 000 048 ...
Страница 87: ...fig 59 Assembling the boiler 59970LTGBW7H031 page 44 4 ERRORS 4 1 General ...
Страница 96: ......
Страница 99: ...fig 62 Exploded view Remeha Avanta 59970EVGBW7H010 ...
Страница 108: ...page 60 ...
Страница 109: ...page 61 ...