When commissioning, complete all relevant sections of the Benchmark
Commissioning Checklist, located on the inside back of this document.
•
Work through all the stages of this section, and send a copy of the completed
commissioning details to Remeha along with the completed registration card
in the supplied warranty leaflet.
•
The Avanta boiler has been live test fired on the production line and set up for
Natural Gas with an inlet gas pressure of 17-20 mbar whilst operating and
should therefore not require any further adjustments.
The boiler must not be put into operation with a different type of gas without
At the time of commissioning, complete all relevant sections of the Benchmark
Checklist located on the inside back of this document.
fig. 32 Benchmark checklist
Содержание Avanta 12v
Страница 15: ...fig 05 Mounting the Avanta 59970 LT GB W7H 002 page 8 2 3 Water side connections 2 3 1 Water flow ...
Страница 34: ...fig 16 Connecting external controls R000158 A page 18 ...
Страница 35: ......
Страница 63: ...fig 42 Read out settings LT AL W7H 000 046 ...
Страница 68: ...fig 43 Change parameters in service level LT AL W7H 000 047 ...
Страница 70: ...fig 44 Change boiler output LT AL W7H 000 048 ...
Страница 87: ...fig 59 Assembling the boiler 59970LTGBW7H031 page 44 4 ERRORS 4 1 General ...
Страница 96: ......
Страница 99: ...fig 62 Exploded view Remeha Avanta 59970EVGBW7H010 ...
Страница 108: ...page 60 ...
Страница 109: ...page 61 ...