Gas connection Ø22 mm
Combustion air inlet Ø100 mm (concentric)
Flue duct Ø60 mm (concentric)
Condensate drain connection ¾"
(standard overflow pipe size)
•
Based on the guidelines and the required installation space, determine where
to mount the Remeha Avanta.
•
In determining the boiler position, consider carefully the flue outlet position
and any pluming consequences.
Содержание Avanta 12v
Страница 15: ...fig 05 Mounting the Avanta 59970 LT GB W7H 002 page 8 2 3 Water side connections 2 3 1 Water flow ...
Страница 34: ...fig 16 Connecting external controls R000158 A page 18 ...
Страница 35: ......
Страница 63: ...fig 42 Read out settings LT AL W7H 000 046 ...
Страница 68: ...fig 43 Change parameters in service level LT AL W7H 000 047 ...
Страница 70: ...fig 44 Change boiler output LT AL W7H 000 048 ...
Страница 87: ...fig 59 Assembling the boiler 59970LTGBW7H031 page 44 4 ERRORS 4 1 General ...
Страница 96: ......
Страница 99: ...fig 62 Exploded view Remeha Avanta 59970EVGBW7H010 ...
Страница 108: ...page 60 ...
Страница 109: ...page 61 ...