S T E P 6
S T E P 6 – D r a g C h a i n
46
docs.carbide3d.com
47
6.5 Install X/Y Transition
Bracket and Y‑Axis Drag Chain
1. Position the bracket and Y-Axis drag chain
combo alongside the Y-Right rail.
See
Fig. 6-5
.
a. Align the bracket with the two M5 screw
holes in the Y-Right carriage plate.
b. Body of the drag chain extends forward
from the bracket, then curls down and back.
2. Use a 3mm hex key and two (2) M5×10mm
BHCS to secure the bracket to the gantry.
Fully tighten.
See
Fig. 6-5
.
Figure 6-4
6.6 Secure Y‑Axis Drag Chain
Tail
1. Position the tail of the Y-Axis drag chain over
the two M3 integrated nuts on the Y-Right
drag chain support panel.
See
Fig. 6-5
.
2. Use a 2mm hex key and two (2) M3×6mm
BHCS to secure the tail of the Y-Axis drag
chain to the support panel. Fully tighten.
Figure 6-5
6.4 Attach Transition Bracket
to Y‑Axis Drag Chain Head
1. Position the X/Y transition bracket on the head
of the Y-Axis drag chain.
See
Fig. 6-4
.
a. Head of chain has all female connectors.
b. The flat side of the head of the drag chain
attaches to the two integrated nuts in the
bracket arm.
2. Use a 2mm hex key and two (2) M3×6mm
BHCS to secure the bracket. Fully tighten.
6.7 Attach Cable Tie Down
1. Stick a self-adhesive cable tie down to the
Y-Right drag chain support panel near the
front-right endplate.
a. Tie down will be used to help secure the
power button wiring in step 9.
NOTE:
Additional tie downs are included in the
extra hardware bag in box 1, in case you need them.
Содержание Shapeoko 4 XXL
Страница 1: ...Shapeoko 4 XXL ASSEMBLY GUIDE...