S T E P 7
S T E P 7 – R o u t e r
56
docs.carbide3d.com
57
7.9 Install X/Y Transition
Bracket and Y‑Axis Drag Chain
1. Position the transition bracket and Y-Axis drag
chain combo alongside the Y-Left rail.
See
Fig. 7-10
.
a. Align the bracket with the two M5 screw
holes in the Y-Left carriage plate.
b. Body of the drag chain extends forward
from the bracket, then curls down and
back.
Figure 7-10
7.10 Secure Y‑Axis Drag
Chain Tail
1. Position the tail of the Y-Axis drag chain over
the two M3 integrated nuts on the Y-Left drag
chain support panel.
See
Fig. 7-11
.
2. Use a 2mm hex key and the two (2) remaining
M3×6mm BHCS to secure the tail to the
support panel.
3. Remove the slack from the router power
cable.
Figure 7-11
7.11 Attach Cable Tie Down
to Drag Chain Support Panel
1. Stick a self-adhesive cable tie down to the
Y-left drag chain support panel near the back-
left endplate.
a. Tie down will be used to help secure the
router power cable in step 9.
NOTE:
Additional tie downs are included in the
extra hardware bag in box 1, in case you need them.
2. Use a 3mm hex key and two (2) M5×10mm
BHCS to secure the bracket. Fully tighten.
Содержание Shapeoko 4 XXL
Страница 1: ...Shapeoko 4 XXL ASSEMBLY GUIDE...