<Work procedure 2-5>
14 / 16
21) Insert the washer
(φ14)
[3] (1 Spare) included in the package into the gap [A] between the plate [1] and
the plate [2] on the rear side of the Process Unit.
22) Align the hole [4] of the washer with the screw hole [5] using tweezers.
23) Fit the 2 bosses [1], and install the screw (M4x8) [4] included in the package in the hole [2] of the washer
and the screw hole [3].
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......