<Work procedure 2-13>
5 / 8
13) Install the removed parts in reverse order.
CAUTION:
Make sure to avoid the edge of the ITB displacement sensor lever from overlapping with the ITB at
installation.
14) ITB position shall be adjusted with a service mode whenever ITB pressure is released.
(ITB positioning adjustment : COPIER > FUNCTION > INSTALL > INIT-ITB)
Procedure for Replacing the Drum Cleaning Unit
1) Open the Front Left Cover and the Front Right Cover.
Replacement Procedure
2) Remove Process Unit Cover.
3) Pull Out primary Charging Assembly
4) Pull Out Process Unit.
5) Remove Drum Cleaning Unit
Caution : Preparation for installing the drum cleaning unit
The drum cleaning unit assigned as parts is not supplied with toner, hence it is necessary to supply the toner
from toner bottle in the content.
6) Remove the cleaner cover and put it on a paper.
- 4 screws
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......