<Work procedure 2-10>
9 / 12
16) Hold the lever [1] of the ITB and the shaft [2] at the rear of the frame of the Intermediate Transfer Belt
Unit.
17) Slide the frame [1] of the Intermediate Transfer Belt Unit to the right, and pull out the hole [A] of the frame
of the Intermediate Transfer Belt Unit from the shaft [2] of the ITB Frame.
18) Lift the frame [1] of the Intermediate Transfer Belt Unit, and pull out the shaft [3] of the ITB Frame from
the groove [B] of the frame of the Intermediate Transfer Belt Unit.
19) Place the frame [1] of the Intermediate Transfer Belt Unit removed from the host machine on paper
stacks or cardboards [2] to prevent it from becoming distorted.
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......