<Work procedure 2-8>
2 / 9
<Detailed work procedure>
CAUTION:
When replacing the 2 External Heat Rollers, replace the 4 External Heat Roller Insulating Bushes, 4 External
Heat Roller Bearings, and 2 External Heat Cleaning Rollers at the same time.
1) Open the Front Left Cover and the Front Right Cover.
Replacement Procedure
2) Pull Out Fixing Feed Unit.
3) Remove the Fixing Pressure Unit.
Caution:
- Before removing the Fixing Pressure Unit, check the situation of the cam through the hole of the Fixing
Assembly.
- When installing the fixing pressure unit, be sure to keep the cam status as it is removed. Write down the
cam status if necessary.
4) Remove External Heat Roller Unit.
5) Remove the pressure arm (front).
- 1 spring (upper only)
- 1 E-ring
- 2 bearings
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......