<Work procedure 2-2>
27 / 31
[When replacing Duplex Feed Roller 1, Duplex Vertical Path Roller 2, Duplex Vertical Path Roller 3]
1) Open the Front Left Cover.
2) Pull out the Buffer Delivery Unit.
3) Remove the delivery outer cover unit.
4) Remove the connector.
-
1 reuse band
5) Remove the delivery outer cover unit in the direction of the arrow. (Remove the plate on the below, lift and
remove the cover unit).
- 2 plates
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......