< Work procedure 1-4>
1 / 12
<Remedy>
_Check the Fixation Screws of the Process Unit for any looseness. [A]
_Check the Fixation Screws of the ITB Positioning Shaft Supports for any looseness or
deformation, and check the ITB Positioning Shaft Supports and the pins of the ITB Positioning
Plate for any damage. [B]
_Check the Pressure Spring of the Primary Transfer Roller for any abnormality. [C]
_Check the Shaft Support Members for any damage. [D]
<Detailed work procedure>
1) Open the Front Left Cover and the Front Right Cover.
Check the Fixation Screws of the Process Unit for any looseness. [A]
2) Remove Process Unit Cover.
3) Check the 4 Fixation Screws [1] of the Process Unit for any looseness.
4) If abnormality is found, replace the faulty part.
5) Install the removed parts in reverse order.
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......