<Work procedure 2-9>
10 / 16
6) Open the controller box unit in the direction of the arrow.
- 2 screws
7) Remove the 2 Stepped Screws [1], 2 springs [2] and 2 washers [3] of the Drawer Connector.
Exploded perspective view
8) Apply grease (Super Lube Grease: FY9-6006 is recommended) to the 5mm area of the 2 Stepped
Screws [1] of the Drawer Connector included in the package as shown in the figure.
Install the 2 springs [2] removed in step 7 and the 2 washers
(φ8)
[3] (1 Spare) included in the package.
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......