<Work procedure 1-7>
8 / 13
18) When abnormality is found in the installation of the 2 Pressure Springs [1] of the Primary Transfer Roller
such as being bent or not properly put on the mount of the spring, correct the deformation of the springs
or their installation.
19) If abnormality is not solved, replace the faulty part.
20) Install the removed parts in reverse order.
CAUTION:
Make sure to avoid the edge of the ITB displacement sensor lever from overlapping with the ITB at
installation.
CAUTION:
After assembly, execute ITB position adjustment in service mode.
(ITB position adjustment: COPIER > FUNCTION > INSTALL > INIT-ITB)
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......