< Work procedure 1-4>
2 / 12
1) Open the front left cover and the front right cover.
Check the Fixation Screws of the ITB Positioning Shaft Supports for any looseness or
deformation, and check the ITB Positioning Shaft Supports and the pins of the ITB
Positioning Plate for any damage. [B]
2) Remove the process unit cover.
3) Remove the ITB positioning plate.
4) Check the 4 Fixation Screws [1] of the ITB Positioning Shaft Supports, the 4 ITB Positioning Shaft
Supports [2], and the 4 pins [3] of the ITB Positioning Plate for any abnormality.
5) If abnormality is found, replace the faulty part.
6) Install the removed parts in reverse order.
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......