
<Work procedure 2-8>
5 / 9
13) Assemble a new External Heat Roller (Upper), 2 new External Heat Roller Insulating Bushes, and 2 new
External Heat Roller Bearings together with the parts removed in step 12 in reverse order.
When replacing the External Heat Roller (Lower)
14) Remove the cable from the cable guide.
- 1 screw (M3)
15) Remove the 2 cables from the cable guide.
- 1 screw (M4)
- 1 screw (M3)
16) Turn over the external heat roller unit.
17) Remove the heater retainer plate and remove the heater in the direction of the arrow.
- 1 screw
Caution:
Be careful not to damage the heater when removing it.
Содержание imagePRESS 1135 Series
Страница 2: ......
Страница 5: ...Section 1 Uneven Density Image Shock Image ...
Страница 6: ......
Страница 8: ... Work procedure 1 1 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 34: ... Work procedure 1 3 2 7 4 Remove the 2 knobs 5 Remove the front cover 4 screws ...
Страница 92: ......
Страница 93: ...Section 2 Banding Image Soiling Image Appears in interval ...
Страница 94: ......
Страница 114: ... Work procedure 2 2 7 31 6 Remove the harness 3 edge saddles 9 connectors 7 Remove the positioning pin 1 screw ...
Страница 123: ... Work procedure 2 2 16 31 14 Remove the 2 screws 15 Remove the 2 center pins 2 screws 16 Remove the 2 timing belts ...
Страница 180: ... Work procedure 2 7 1 2 Remedy Replacing the Pressure Roller H ...
Страница 182: ... Work procedure 2 8 1 9 Remedy Replacing the External Heat Rollers I ...
Страница 219: ... Work procedure 2 11 1 2 Remedy Replacing the Fixing Roller L ...
Страница 242: ......