![Canon CXDI-40G COMPACT Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/canon/cxdi-40g-compact/cxdi-40g-compact_service-manual_4002850031.webp)
2. Installation
- 11 -
4. Connection to Units
4.1 CXDI-40G COMPACT Installation Flowchart
END
* Except for grid, phototimer and other
parts that are located in the X-ray entrance
surface must be installed when calibration
imaging is performed.
START
Affix the insulation sheets to
the imaging unit
Install the imaging unit
Install the phototimer
Install the power box and
control PC
Conduct calibration imaging
Install the grid
Conduct the self-diagnostic
test
* The Bucky unit (stand or table) and
imaging unit must be electrically isolated
from each other.
*Check the grid installation angle.
Содержание CXDI-40G COMPACT
Страница 24: ...2 Installation 4 2 CXDI SYSTEM III Assembly Packaging Accessories Box Power Box ...
Страница 56: ...2 Installation 36 8 3 When Timeout due to RX_REQ not Negating ...
Страница 135: ...2 Installation 115 16 2 Power Box Mass 4 2 Kg not including cable Unit mm ...
Страница 136: ...2 Installation 116 16 3 Ready Lamp Unit Mass 0 5 Kg Unit mm ...
Страница 165: ...CXDI SYSTEM Rev 01 CONTENTS CXDI 40G COMPACT 1 IMAGING UNIT 2 POWER BOX 3 INDEX OF PARTS NUMBERS 4 ...
Страница 167: ...CXDI SYSTEM 1 2 Rev 01 Canon Inc Key No 5 Key No 6 Key No 7 Key No 8 Key No 9 Key No 10 Key No 11 ...