![Canon CXDI-40G COMPACT Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/canon/cxdi-40g-compact/cxdi-40g-compact_service-manual_4002850030.webp)
2. Installation
- 10 -
No.
Step
Conditions and checkpoints
Reference
17
Set the Fixed ROI areas
- If necessary, to set the ROI area.
“Set the Fixed
ROI areas”
18
Set exposure parameter table
- Set it in consultation with the technician.
“Table Setup
Setting”
19
Set annotation
- Set it in consultation with the technician.
“Performing the
Annotation
Setting”
20
Connect the network and set
the output destination
“Network
Connections” in
“Setting”
21
Startup settings
“Set Up Startup
Menu” in
“Setting”
22
Check the linearity of the
transferred image density
“Linearity
Check of
Transfer Image
Density” in
“Setting”
23
Correct operation unit gamma
“Operation Unit
Gamma
Correction” in
“Setting”
24
Install the grid
- Install in the Bucky unit, stand or table.
- Check the grid installation angle.
- Use as a fixed grid.
25 Self-diagnostic testing
- No errors must be displayed.
26
Radiographic testing
- Check the image quality and transfer
operation to printer and storage.
“Image Quality
Check”
27
Body parts settings
- The engineer in charge must be consulted
prior to performing these settings.
Operation
Manual
28
Check and perform the system
settings
- The engineer in charge must be consulted
prior to performing these settings.
“Setting”
29
Perform the overall
adjustment and delete
unneeded data
- Check according to the check sheet.
- Delete unneeded data.
“Post
Installation
Check” in
“Setting”
30 Clean
31
Explain operation to the user
Operation
Manual
32
Adjust final parameters
- The engineer in charge must be consulted
prior to narrowing down the adjustments to
the final values.
Operation
Manual
33
Backing up valuable data
- Back up when setting, and back up the
setting data to FD.
“Backing Up
when Setting”
and “Backing
Up Setting Data
to FD” in
“Setting”
Содержание CXDI-40G COMPACT
Страница 24: ...2 Installation 4 2 CXDI SYSTEM III Assembly Packaging Accessories Box Power Box ...
Страница 56: ...2 Installation 36 8 3 When Timeout due to RX_REQ not Negating ...
Страница 135: ...2 Installation 115 16 2 Power Box Mass 4 2 Kg not including cable Unit mm ...
Страница 136: ...2 Installation 116 16 3 Ready Lamp Unit Mass 0 5 Kg Unit mm ...
Страница 165: ...CXDI SYSTEM Rev 01 CONTENTS CXDI 40G COMPACT 1 IMAGING UNIT 2 POWER BOX 3 INDEX OF PARTS NUMBERS 4 ...
Страница 167: ...CXDI SYSTEM 1 2 Rev 01 Canon Inc Key No 5 Key No 6 Key No 7 Key No 8 Key No 9 Key No 10 Key No 11 ...