4. Repair Guide
- 9 -
(3) When PCB-40EAD is replaced
1) Check the image quality
Refer to “14 Image Quality” in “12 Settings” in “2. Installation”.
2) Power box
(1) When PWB-40EXRAY is replaced
1) Set the jumper pins on the PCB.
Refer to “3 PCB settings” in “4. Repair Guide”.
Check that the system starts up normally and that operations such as exposure, images capture
and data transfer are performed normally.
Содержание CXDI-40G COMPACT
Страница 24: ...2 Installation 4 2 CXDI SYSTEM III Assembly Packaging Accessories Box Power Box ...
Страница 56: ...2 Installation 36 8 3 When Timeout due to RX_REQ not Negating ...
Страница 135: ...2 Installation 115 16 2 Power Box Mass 4 2 Kg not including cable Unit mm ...
Страница 136: ...2 Installation 116 16 3 Ready Lamp Unit Mass 0 5 Kg Unit mm ...
Страница 165: ...CXDI SYSTEM Rev 01 CONTENTS CXDI 40G COMPACT 1 IMAGING UNIT 2 POWER BOX 3 INDEX OF PARTS NUMBERS 4 ...
Страница 167: ...CXDI SYSTEM 1 2 Rev 01 Canon Inc Key No 5 Key No 6 Key No 7 Key No 8 Key No 9 Key No 10 Key No 11 ...