3. Select the C
Commissioning menu by turning the
button.
4. Confirm the menu selection by pressing the button .
Note
Press the
MENU
key to return to the main display.
The C
Commissioning mode parameters are now accessible. Use the
button to select and modify them.
See
List of installer parameters, page 74.
8.2 Starting up the boiler
1. Start up the boiler by pressing the ON/OFF switch.
2. Open the gas cock.
3. Press the
key to access the shortcuts menu.
4. Select the S
Standby/operation parameter by turning the
button.
5. Press the button to start up the boiler.
The symbol disappears.
8.3 Stopping the boiler
Note
Prefer the O
Off or S
Standby operating mode.
See
Activating Protection mode, page 70
Putting the boiler in Standby mode, page 69
1. Switch off the boiler by pressing the ON/OFF switch.
2. Close the gas cock.
8.3.1 Putting the boiler in Standby mode
1. Press the
key to access the shortcuts menu.
2. Select the S
Standby/operation parameter by turning the
button.
3. Press the button to put the boiler in standby.
The symbol is displayed.
Fig.73
MW-3000083-EN-02
MENU
----------------------------------------------------
Enduser
Commissioning
Fig.74
MW-3000084-EN-02
MENU
Enduser
Commissioning
Engineer
Fig.75 Starting up the boiler
MW-3000050
1
8 Operation
7609474 - v02 - 04092014
69