![Baxi POWER HT+ 1.110 Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/baxi/power-ht-1-110/power-ht-1-110_installation-and-service-manual_2711894029.webp)
55.4 Transport
Transport the pallet carrying the appliance using a pallet truck, a forklift
truck or a 4-wheel removals cart.
Do not use the top cover of the appliance for transport lifting.
Transport the appliance vertically.
Note
Have two people available.
Handle the appliance with gloves.
5.5 Unpacking and initial preparation
1. Remove the cardboard packaging.
2. Remove the plastic protection and the polystyrene cover.
3. Remove the front panel.
4. Remove the screws fixing the boiler to the pallet.
5. Take the condensate hose that you will find in the boiler and connect
it to the condensate discharge.
6. Put the boiler in its intended position.
Caution
Moving the boiler is a job for two people.
7. Level the boiler using the adjustable feet.
Fig.24 Transport precautions
MW-3000015
>45°
Fig.25 Unpacking
MW-3000016
1
2
Fig.26 Preparation
MW-3000017
3
4
x3
5 Before installation
7609474 - v02 - 04092014
29
Содержание POWER HT+ 1.110
Страница 120: ...13 Appendix 120 7609474 v02 04092014 ...
Страница 121: ...13 Appendix 7609474 v02 04092014 121 ...
Страница 122: ...13 Appendix 122 7609474 v02 04092014 ...