P
Parameter number
Parameter
Setting
6020
FFunction extension module 1
Multifunctional
6046
FFunction input H2 module 1
Consumer request VK1 10V
6049
V
Voltage value 1 H2 module 1
0
6050
FFunct value 1 H2 module 1
0
6051
V
Voltage value 2 H2 module 1
10
6052
FFunct value 2 H2 module 1
800
(1)
(1) This parameter setting is an example. The value 800 means that, at 10V, the set point will be 80°C.
See
List of installer parameters, page 74.
7.5.4 Configuring a lead boiler and the secondary boilers in a cas
cade
See
Connecting boilers in cascade with an OCI 345 interface, page 54.
1. Access the installer parameters of the lead boiler.
See
Modifying the installer parameters, page 68.
2. Set the following parameters on the lead boiler:
Tab.33 Configuration cascade lead boiler
Parameter number
Parameter
Setting
Description
5977
FFunction input H5
None
Deactivation of the thermostat
on terminal block M
M1 (1–2)
6030
R
Relay output QX21 module 1
heating pump CH1 Q2
Check on the pump on circuit
1
6040
S
Sensor input BX21 module 1
Common flow sensor B10
Check on the cascade flow
temperature
6041
S
Sensor input BX22 module 1
Cascade return sensor B70
Check on the cascade return
temperature
6200
S
Save sensors
Yes
Saving any modifications
made.
The setting will revert auto
matically to N
No immediately af
ter the adjustment.
6630
C
Cascade master
Always
Identification lead boiler
6640
C
Clock mode
Autonomously
Cascade lead boiler clock set
ting
See
List of installer parameters, page 74.
3. Access the installer parameters of the secondary boiler(s).
See
Modifying the installer parameters, page 68.
4. Set the following parameters on the secondary boiler(s).
Tab.34 Configuration cascade secondary boilers
Parameter number
Parameter
Setting
Description
5710
TTemps / mode CH1
Off
Deactivation of the thermostat
on terminal block M
M1 (1–2)
6600
D
Device address
2...3...4...
Cascade activation
7 Commissioning
66
7609474 - v02 - 04092014
Содержание POWER HT+ 1.110
Страница 120: ...13 Appendix 120 7609474 v02 04092014 ...
Страница 121: ...13 Appendix 7609474 v02 04092014 121 ...
Страница 122: ...13 Appendix 122 7609474 v02 04092014 ...