Copyright 2020 Baker Hughes Company. All rights reserved.
Page 95 of 277
Figure 69: Set Well Name-Screen 2
Press the Save function button. Acknowledge the confirmation screen by pressing the Yes
function button. Press the Exit function button to return to the Other Initial Setup menu. The
Other Initial Setup menu screen now reflects the well name you entered.
Figure 70: Initial Setup Updated Well Name Screen
Repeat to set the Site Name. A Site Name is not required but can be used to group well data
from a specific field in one folder.
Содержание Apollo 3
Страница 1: ...Copyright 2020 Baker Hughes Company All rights reserved Page 1 of 277...
Страница 46: ...Copyright 2020 Baker Hughes Company All rights reserved Page 46 of 277 Figure 20 Backspin Probes Drawing 2...
Страница 139: ...Copyright 2020 Baker Hughes Company All rights reserved Page 139 of 277 Figure 116 Murphy Switch Trigger Example 1...
Страница 266: ...Copyright 2020 Baker Hughes Company All rights reserved Page 266 of 277 Figure 227 USB Menu...
Страница 267: ......
Страница 276: ......
Страница 277: ...Index 129112 28 197705 28 197349 28 800638 28 197350 28 810280 28 197351 29...