OPERATION
63
When the DUT passed the DC Withstand Voltage test, when the test process is
complete the display will show:
DCW Pass XXX.X s
MXX-X X.XX KV XXXX
m
A
5.4 The followings are the displayed messages for the Insulation Resistance test:
If the test in process is Aborted with the RESET button or remote control, the
display will show:
IR
Abort
XXX.X s
MXX-X XXXX V XXXX M
W
If the test in process is Aborted with the RESET button or remote control before the
meter readings are taken, the display will show:
IR
Abort
XXX.X
s
MXX-X - - - - V - - - - M
W
or IR Abort XXX.X s
MXX-X XXXX V - - - - M
W
At the beginning of Insulation Resistance test when the voltage begins to ramp but
before the meter readings are taken, the display will show:
IR
Delay
XXX.X s
MXX-X - - - - V - - - - M
W
During the Insulation Resistance test when the values are being updated in real time
during the Delay cycle, the display will show:
IR
Delay
XXX.X
s
MXX-X XXXX V XXXX M
W
If the leakage current during the Ramp cycle falls below the Charge -LO setting,
then the display will show:
IR
Charge-LO
XXX.X s
MXX-X - - - - V - - - - M
W
If the DUT current exceeds the HI-Limit of Insulation Resistance test and the
resistance is within the metering range, the display will show:
IR
HI-Limit
XXX.X s
MXX-X XXXX V XXXX M
W