hypercharger - Operation Instructions and Installation Guide
Version 1-1C
Page 30 of 57
4
Mechanical
installation
All rights reserved. The reproduction of this document, also partially, is allowed only with authorization by alpitronic s.r.l.
4.4. Mechanical installation of the hypercharger
It is recommended to install the hypercharger according the following steps:
-
Preparation of the foundation (see chapter 4.1)
-
Mounting of the adaptor to the concrete foundation (see chapter 4.2), only if a universal
foundation is used
-
Mounting of the hypercharger base (see chapter 4.3)
-
Preparation of the mains power-supply (see chapter 5.3)
-
Lift the hypercharger with a crane on the hypercharger base
-
Screw the hypercharger via 4x M12x30 screws and 35mm washers together to the
hypercharger-base. The screws are to be tightened with a torque of 90Nm.
It’s
preferable to use self-locking thread lock washers.
-
Connect the mains power-supply (see chapter 5.4)