Mechanical
installation
Page 29 of 57
All rights reserved. The reproduction of this document, also partially, is allowed only with authorization by alpitronic s.r.l.
Figure 24:
hypercharger-base for the HYC_075 and HYC_150 (front/top view left)
The following figure shows the hypercharger-base for the HYC_225 and the HYC_300:
Figure 25:
hypercharger-base for the HYC_225 and HYC_300 (front/top view left)
Suitable washers are to be provide. The hypercharger-base is to screw together with the
concrete foundation or with the adaptor (in the case a universal foundation is used) by 4x
M12x30 screws and washers (M12 x 35mm / delivered together with the hypercharger).
The screws are to be tightened with a torque of 90Nm.
For the hypercharge-base different cable entry adaptor-plates are available to enable
different mains power-supply cables (details in chapter 5.3).
572
272
200
400
50
200
286
286
20
5
4
6
Ø20mm
572
5
0
4
7
0
400