Engineering manual
28
3.12.1 The project actual design flow
A.
Discuss with the owner of the house or structure project principal to confirm where the outdoor unit
installs and which room need install indoor units.
The result after this step:
The room need to install
indoor units
Bedroom 1
Bedroom 2
Dining-room and drawing
room
The type of indoor units
PNV(wall mounted)
PNV(wall mounted)
CKV(cassette)
Reason
The house owner’s demand The house owner’s demand
The CKV is the most
suitable according the
configuration
Outdoor unit location
The B point in the picture above
Reason
1.
The house owner’s demand
2.
Away from the bedrooms
B.
Calculate the capacity requirement for every room and select the indoor units primary
The room need to install
indoor units
Bedroom 1
Bedroom 2
Dining-room and drawing
room
Space size(m
2
) 3×3.6=10.8 2.7×2.4=6.5 3.6×6=21.6
Capacity requirement
ratio(Cooling)
150W/m
2
150W/m
2
250W/m
2
Capacity
requirement(Cooling)
10.8×0.15=1.62kW 6.5×0.15=0.975kW 21.6×0.25=5.4kW
Indoor units type and model
PNV007
PNV007
CKV018
Содержание KXV Series
Страница 36: ...Engineering manual 36 Heating Chart 1 1 b...
Страница 68: ...Engineering manual 68 1 3 Dimension diagram and exploded view 1 3 1 Dimension diagram Chart 1 5 Chart 1 6...
Страница 69: ...Engineering manual 69 1 3 2 Exploded view Unit body exploded view Chart 1 7...
Страница 70: ...Engineering manual 70 Panel exploded view Chart 1 8...
Страница 75: ...Engineering manual 75 1 4 Electric board wiring diagram Chart 1 9...
Страница 93: ...Engineering manual 93 2 3 2 Exploded view Unit body exploded view Chart 2 5...
Страница 94: ...Engineering manual 94 Panel exploded view Chart 2 6...
Страница 99: ...Engineering manual 99 2 4 Electric board wiring diagram Chart 2 7...
Страница 118: ...Engineering manual 118 3 3 2 Exploded view Chart 3 6...
Страница 124: ...Engineering manual 124 3 4 Electric board wiring diagram Chart 3 7...
Страница 143: ...Engineering manual 143 4 3 2 Exploded view DLV007 009 012 015 exploded view Chart 4 4...
Страница 144: ...Engineering manual 144 DLV018 021 024 exploded view Chart 4 5...
Страница 150: ...Engineering manual 150 4 4 Electric board wiring diagram Chart 4 6...
Страница 165: ...Engineering manual 165 5 3 Dimension diagram and exploded view 5 3 1 Dimension diagram Chart 5 3...
Страница 166: ...Engineering manual 166 5 3 2 Exploded view Chart 5 4...
Страница 167: ...Engineering manual 167 5 4 Electric board wiring diagram Chart 5 5...
Страница 177: ...Engineering manual 177 5 9 Operation and maintenance Please refer to DLV series corrective section above...
Страница 182: ...Engineering manual 182 6 3 2 Exploded view PNV007 009 012 exploded view Chart 6 5...
Страница 183: ...Engineering manual 183 PNV015 018 021 exploded view Chart 6 6...
Страница 189: ...Engineering manual 189 6 4 Electric board wiring diagram Chart 6 7...
Страница 203: ...Engineering manual 203 Part IV Outdoor unit 1 OUTDOOR UNIT 204 2 HMI HUMAN AND MACHINE INTERFACE INTRODUCTION 236...
Страница 204: ...Engineering manual 204 1 Outdoor unit Model KBTU h Brand YAV112 38 2 YAV140 47 8 Airwell...
Страница 206: ...Engineering manual 206 1 2 Dimension diagram and exploded view 1 2 1 Dimension diagram Chart 1 1...
Страница 207: ...Engineering manual 207 1 2 2 Exploded view YAV112 140 Chart 1 2...
Страница 210: ...Engineering manual 210 1 3 Electric board wiring diagram Chart 1 3...
Страница 212: ...Engineering manual 212 Chart 1 10 Chart 1 11 Chart 1 12 Chart 1 13 Chart 1 14 Unit mm...
Страница 283: ...Engineering manual 283 Chart 3 4...
Страница 294: ...Engineering manual 294 4 1 Appearance RC3i 1 A Q C E F G I D H J K L M N O P B...
Страница 295: ...Engineering manual 295 A B C G D F E H I J K L M N O P Q RC7i 1...
Страница 372: ...Engineering manual 372...
Страница 376: ...Engineering manual 376 Click the value area of axis a dialog is shown to set the range of axis...