Engineering manual
172
E.
Check the drainage
Put the water into the drain tray-Styrofoam.
Ensure that water flows out from drain hose of the indoor unit.
F.
Location CRITERIA
It is recommended to install the Display Control unit close to a ceiling in a centre and neutral zone at typical conditions.
In addition, the aesthetic aspect should be considered. The Display Control unit is connected to the main control board
on the air conditioner (the indoor unit) by a communication cable. The cable is connected to the display control unit by a
quick-connector.
G.
INSTALLATION OF DISPLAY CONTROL UNIT ON WALL
Drill a 12 mm diameter hole on the wall, for routing the communication cable.
Open the unit cover, drill 3 holes in the wall to match the holes in the Display Control Unit, install the inserts and
fasten the unit to the wall with 3 screws.
The Display Control Unit is provided of a special communication cable, 7 meters long, terminated by a plug,
connected in the housing itself to a distribution box, which enables the control of the air conditioner from several
different rooms, each one from its own Display Control Unit.
Chart 5-11
Содержание KXV Series
Страница 36: ...Engineering manual 36 Heating Chart 1 1 b...
Страница 68: ...Engineering manual 68 1 3 Dimension diagram and exploded view 1 3 1 Dimension diagram Chart 1 5 Chart 1 6...
Страница 69: ...Engineering manual 69 1 3 2 Exploded view Unit body exploded view Chart 1 7...
Страница 70: ...Engineering manual 70 Panel exploded view Chart 1 8...
Страница 75: ...Engineering manual 75 1 4 Electric board wiring diagram Chart 1 9...
Страница 93: ...Engineering manual 93 2 3 2 Exploded view Unit body exploded view Chart 2 5...
Страница 94: ...Engineering manual 94 Panel exploded view Chart 2 6...
Страница 99: ...Engineering manual 99 2 4 Electric board wiring diagram Chart 2 7...
Страница 118: ...Engineering manual 118 3 3 2 Exploded view Chart 3 6...
Страница 124: ...Engineering manual 124 3 4 Electric board wiring diagram Chart 3 7...
Страница 143: ...Engineering manual 143 4 3 2 Exploded view DLV007 009 012 015 exploded view Chart 4 4...
Страница 144: ...Engineering manual 144 DLV018 021 024 exploded view Chart 4 5...
Страница 150: ...Engineering manual 150 4 4 Electric board wiring diagram Chart 4 6...
Страница 165: ...Engineering manual 165 5 3 Dimension diagram and exploded view 5 3 1 Dimension diagram Chart 5 3...
Страница 166: ...Engineering manual 166 5 3 2 Exploded view Chart 5 4...
Страница 167: ...Engineering manual 167 5 4 Electric board wiring diagram Chart 5 5...
Страница 177: ...Engineering manual 177 5 9 Operation and maintenance Please refer to DLV series corrective section above...
Страница 182: ...Engineering manual 182 6 3 2 Exploded view PNV007 009 012 exploded view Chart 6 5...
Страница 183: ...Engineering manual 183 PNV015 018 021 exploded view Chart 6 6...
Страница 189: ...Engineering manual 189 6 4 Electric board wiring diagram Chart 6 7...
Страница 203: ...Engineering manual 203 Part IV Outdoor unit 1 OUTDOOR UNIT 204 2 HMI HUMAN AND MACHINE INTERFACE INTRODUCTION 236...
Страница 204: ...Engineering manual 204 1 Outdoor unit Model KBTU h Brand YAV112 38 2 YAV140 47 8 Airwell...
Страница 206: ...Engineering manual 206 1 2 Dimension diagram and exploded view 1 2 1 Dimension diagram Chart 1 1...
Страница 207: ...Engineering manual 207 1 2 2 Exploded view YAV112 140 Chart 1 2...
Страница 210: ...Engineering manual 210 1 3 Electric board wiring diagram Chart 1 3...
Страница 212: ...Engineering manual 212 Chart 1 10 Chart 1 11 Chart 1 12 Chart 1 13 Chart 1 14 Unit mm...
Страница 283: ...Engineering manual 283 Chart 3 4...
Страница 294: ...Engineering manual 294 4 1 Appearance RC3i 1 A Q C E F G I D H J K L M N O P B...
Страница 295: ...Engineering manual 295 A B C G D F E H I J K L M N O P Q RC7i 1...
Страница 372: ...Engineering manual 372...
Страница 376: ...Engineering manual 376 Click the value area of axis a dialog is shown to set the range of axis...