Engineering manual
25
3.11 Refrigerant additional charge (based on piping length and size)
3.11.1 Calculate the system additional charge
Refrigerant Charge Amount at shipment (for outdoor unit)
YAV112 YAV140
Heat Pump Unit (kg)
4.5 5.5
According the refrigerant pipe length and dimension, we need charge additional refrigerant.
The required additional refrigerant charge (kg) =
(
25×a+55×b+120×c
)
×
10
-3
a: Total length of
Φ
6.35 (m) liquid tube
b: Total length of
Φ
9.52 (m) liquid tube
c: Total length of
Φ
12.7(m) liquid tube.
3.11.2 Judge the system refrigerant quantity
There is a function in our VRF system to judge whether the quantity of the system refrigerant enough or not. This
function is named CTEST (charge test), we can apply it according to the HMI’s operation (Refer to ODU’s introduction
in this manual)
The CTEST operation flow is as below:
Table 3-7
Содержание KXV Series
Страница 36: ...Engineering manual 36 Heating Chart 1 1 b...
Страница 68: ...Engineering manual 68 1 3 Dimension diagram and exploded view 1 3 1 Dimension diagram Chart 1 5 Chart 1 6...
Страница 69: ...Engineering manual 69 1 3 2 Exploded view Unit body exploded view Chart 1 7...
Страница 70: ...Engineering manual 70 Panel exploded view Chart 1 8...
Страница 75: ...Engineering manual 75 1 4 Electric board wiring diagram Chart 1 9...
Страница 93: ...Engineering manual 93 2 3 2 Exploded view Unit body exploded view Chart 2 5...
Страница 94: ...Engineering manual 94 Panel exploded view Chart 2 6...
Страница 99: ...Engineering manual 99 2 4 Electric board wiring diagram Chart 2 7...
Страница 118: ...Engineering manual 118 3 3 2 Exploded view Chart 3 6...
Страница 124: ...Engineering manual 124 3 4 Electric board wiring diagram Chart 3 7...
Страница 143: ...Engineering manual 143 4 3 2 Exploded view DLV007 009 012 015 exploded view Chart 4 4...
Страница 144: ...Engineering manual 144 DLV018 021 024 exploded view Chart 4 5...
Страница 150: ...Engineering manual 150 4 4 Electric board wiring diagram Chart 4 6...
Страница 165: ...Engineering manual 165 5 3 Dimension diagram and exploded view 5 3 1 Dimension diagram Chart 5 3...
Страница 166: ...Engineering manual 166 5 3 2 Exploded view Chart 5 4...
Страница 167: ...Engineering manual 167 5 4 Electric board wiring diagram Chart 5 5...
Страница 177: ...Engineering manual 177 5 9 Operation and maintenance Please refer to DLV series corrective section above...
Страница 182: ...Engineering manual 182 6 3 2 Exploded view PNV007 009 012 exploded view Chart 6 5...
Страница 183: ...Engineering manual 183 PNV015 018 021 exploded view Chart 6 6...
Страница 189: ...Engineering manual 189 6 4 Electric board wiring diagram Chart 6 7...
Страница 203: ...Engineering manual 203 Part IV Outdoor unit 1 OUTDOOR UNIT 204 2 HMI HUMAN AND MACHINE INTERFACE INTRODUCTION 236...
Страница 204: ...Engineering manual 204 1 Outdoor unit Model KBTU h Brand YAV112 38 2 YAV140 47 8 Airwell...
Страница 206: ...Engineering manual 206 1 2 Dimension diagram and exploded view 1 2 1 Dimension diagram Chart 1 1...
Страница 207: ...Engineering manual 207 1 2 2 Exploded view YAV112 140 Chart 1 2...
Страница 210: ...Engineering manual 210 1 3 Electric board wiring diagram Chart 1 3...
Страница 212: ...Engineering manual 212 Chart 1 10 Chart 1 11 Chart 1 12 Chart 1 13 Chart 1 14 Unit mm...
Страница 283: ...Engineering manual 283 Chart 3 4...
Страница 294: ...Engineering manual 294 4 1 Appearance RC3i 1 A Q C E F G I D H J K L M N O P B...
Страница 295: ...Engineering manual 295 A B C G D F E H I J K L M N O P Q RC7i 1...
Страница 372: ...Engineering manual 372...
Страница 376: ...Engineering manual 376 Click the value area of axis a dialog is shown to set the range of axis...