Engineering manual
103
2. Please select the position of installation hooks according to the hook holes in the installation board.
Drill four holes of M12mm, 45-50mm deep at the selected positions on the ceiling. Then embed the expansible
hooks (fittings).
Face the concave side of the installation hooks towards the expansible hooks. Determine the length
of the installation hooks from the height of ceiling, then cut off the unnecessary part.
The length could be calculated from Chart 2-10:
Length= H-181+L ( in general, L=100mm and is half of the whole length of the installation hook)
3. Please adjust the hexangular nuts on the four installation hooks evenly, to ensure the balance of the
body.
If the drainpipe is away, leakage will be caused by the malfunction of the water-level switch.
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The
body’s lower part should sink into the ceiling for 10-12mm (Refer to Chart 2-10).
Location the air conditioner firmly by wrenching the nuts after having adjusted the body’s position
well.
B.
Install the main body on new built houses and ceilings
1. In the case of new built house, the hook can be embedded in advance (refer to the A.2 mentioned
Above).But it should be strong enough to bear the indoor unit and will not become loose because of concrete shrinking.
2. After installing the body, please fasten the installation paper board onto the air conditioner with bolts (M6
×
12) to
determine in advance the sizes and positions of the hole opening on ceiling.
Please first guarantee the flatness and horizontal of ceiling when installing it.
Refer to the A.1 mentioned above for others.
3. Refer to the A. 3 mentioned above for installation.
4. Remove the installation paper board.
Chart 2-10
Caution:
After completion of installing the body, the four bolts (M6X12) must be fastened
to the air conditioner to ensure the body is grounded well.
Содержание KXV Series
Страница 36: ...Engineering manual 36 Heating Chart 1 1 b...
Страница 68: ...Engineering manual 68 1 3 Dimension diagram and exploded view 1 3 1 Dimension diagram Chart 1 5 Chart 1 6...
Страница 69: ...Engineering manual 69 1 3 2 Exploded view Unit body exploded view Chart 1 7...
Страница 70: ...Engineering manual 70 Panel exploded view Chart 1 8...
Страница 75: ...Engineering manual 75 1 4 Electric board wiring diagram Chart 1 9...
Страница 93: ...Engineering manual 93 2 3 2 Exploded view Unit body exploded view Chart 2 5...
Страница 94: ...Engineering manual 94 Panel exploded view Chart 2 6...
Страница 99: ...Engineering manual 99 2 4 Electric board wiring diagram Chart 2 7...
Страница 118: ...Engineering manual 118 3 3 2 Exploded view Chart 3 6...
Страница 124: ...Engineering manual 124 3 4 Electric board wiring diagram Chart 3 7...
Страница 143: ...Engineering manual 143 4 3 2 Exploded view DLV007 009 012 015 exploded view Chart 4 4...
Страница 144: ...Engineering manual 144 DLV018 021 024 exploded view Chart 4 5...
Страница 150: ...Engineering manual 150 4 4 Electric board wiring diagram Chart 4 6...
Страница 165: ...Engineering manual 165 5 3 Dimension diagram and exploded view 5 3 1 Dimension diagram Chart 5 3...
Страница 166: ...Engineering manual 166 5 3 2 Exploded view Chart 5 4...
Страница 167: ...Engineering manual 167 5 4 Electric board wiring diagram Chart 5 5...
Страница 177: ...Engineering manual 177 5 9 Operation and maintenance Please refer to DLV series corrective section above...
Страница 182: ...Engineering manual 182 6 3 2 Exploded view PNV007 009 012 exploded view Chart 6 5...
Страница 183: ...Engineering manual 183 PNV015 018 021 exploded view Chart 6 6...
Страница 189: ...Engineering manual 189 6 4 Electric board wiring diagram Chart 6 7...
Страница 203: ...Engineering manual 203 Part IV Outdoor unit 1 OUTDOOR UNIT 204 2 HMI HUMAN AND MACHINE INTERFACE INTRODUCTION 236...
Страница 204: ...Engineering manual 204 1 Outdoor unit Model KBTU h Brand YAV112 38 2 YAV140 47 8 Airwell...
Страница 206: ...Engineering manual 206 1 2 Dimension diagram and exploded view 1 2 1 Dimension diagram Chart 1 1...
Страница 207: ...Engineering manual 207 1 2 2 Exploded view YAV112 140 Chart 1 2...
Страница 210: ...Engineering manual 210 1 3 Electric board wiring diagram Chart 1 3...
Страница 212: ...Engineering manual 212 Chart 1 10 Chart 1 11 Chart 1 12 Chart 1 13 Chart 1 14 Unit mm...
Страница 283: ...Engineering manual 283 Chart 3 4...
Страница 294: ...Engineering manual 294 4 1 Appearance RC3i 1 A Q C E F G I D H J K L M N O P B...
Страница 295: ...Engineering manual 295 A B C G D F E H I J K L M N O P Q RC7i 1...
Страница 372: ...Engineering manual 372...
Страница 376: ...Engineering manual 376 Click the value area of axis a dialog is shown to set the range of axis...