Time
The fault
occurs
Protection
operate time
Trip and Pickup
CCRBRF
(50BF)
Normal t
cbopen
Margin
Retrip delay t1
t
cbopen
after re-trip
t
BFPreset
Minimum back-up trip delay t2
Critical fault clearance time for stability
ANSI05000479_3_en.vsd
ANSI05000479 V3 EN
Figure 115:
Time sequence
7.11
Breaker failure protection phase segregated activation
and output CSPRBRF (50BF)
7.11.1
Identification
Function description
IEC 61850 identification
IEC 60617 identification
ANSI/IEEE C37.2 device
number
Breaker failure
protection, phase
segregated activation
and output
CSPRBRF
3I>BF
SYMBOL-U V1 EN
50BF
7.11.2
Application
In the design of the fault clearance system the N-1 criterion is often used. This means that
a fault needs to be cleared even if any component in the fault clearance system is faulty.
1MRK 506 334-UUS A
Section 7
Current protection
233
Application manual
Содержание REL650 series
Страница 1: ...Relion 650 series Line distance protection REL650 ANSI Application manual...
Страница 2: ......
Страница 30: ...24...
Страница 99: ...IED IED ANSI05000460 V2 EN 1MRK 506 334 UUS A Section 4 Analog inputs 93 Application manual...
Страница 110: ...104...
Страница 260: ...254...
Страница 274: ...268...
Страница 280: ...274...
Страница 396: ...390...
Страница 494: ...488...
Страница 506: ...500...
Страница 515: ...509...