![ABB OmniCore E10 Скачать руководство пользователя страница 106](http://html.mh-extra.com/html/abb/omnicore-e10/omnicore-e10_product-manual_5108106.webp)
4.2 Inspection activities
4.2.1 Inspection of controller
Inspecting the OmniCore E10 controller
Note/illustration
Action
DANGER
Before doing any work inside the cabinet,
disconnect the mains power. For more
information, see
1
Location of wrist strap button:
ELECTROSTATIC DISCHARGE
(ESD)
The unit is sensitive to ESD. Before
handling the unit read the safety inform-
ation in section
2
xx2100001295
Inspect connectors and cabling to make
sure they are securely fastened and
cabling not damaged.
3
Inspect the fans and ventilation holes to
make sure they are clean.
4
After inspection: Temporarily turn the
power supply on. Inspect the fans to
make sure they function correctly. Switch
the power off.
5
106
Product manual - OmniCore E10
3HAC079399-001 Revision: C
© Copyright 2019-2022 ABB. All rights reserved.
4 Maintenance
4.2.1 Inspection of controller
Содержание OmniCore E10
Страница 1: ...ROBOTICS Product manual OmniCore E10 ...
Страница 2: ...Trace back information Workspace 22A version a10 Checked in 2022 03 02 Skribenta version 5 4 005 ...
Страница 8: ...This page is intentionally left blank ...
Страница 34: ...This page is intentionally left blank ...
Страница 198: ...This page is intentionally left blank ...
Страница 206: ...This page is intentionally left blank ...
Страница 224: ...This page is intentionally left blank ...
Страница 228: ......
Страница 229: ......