2101510 Rev. AG
Page 3–35
3.17.1 Instructions
1)
Position the bottle rack in close proximity to the NGC.
2)
Secure the rack to the pipe meter run with the provided mounting hardware.
3)
Install both the carrier and calibration gas bottles in the rack.
4)
Strap both bottles in the rack to prevent falling.
Figure 3-35 Carrier/Calibration Gas Bottle Rack Installation
3.18 ENC82 Carrier Gas Bottle Rack Installation
The carrier gas bottle rack is installed on the back of the
ENC82L or the side of the ENC82S.
A gas regulator should be installed on each gas bottle (see
3.18.1 Materials
•
1 ea. bracket with chain assembly attached
•
2 ea. 3/8”-16 x 5/8 SST hex head bolt
•
2 ea. 3/8” SST split washers
•
2 ea. 3/8” SST flat washers
3.18.2 Instructions
1)
Locate bracket holes on the rear of the large enclosure or the side of the
small enclosure stand.
2)
Place a split washer then a flat washer on one of the 5/8” bolts and insert through
bolt hole located in the bottle rack bracket into the corresponding hole located
along the bottom edge of the enclosure, then tighten (see
CALIBRATION
GAS
CARRIER
GAS
TO NGC
Содержание NGC8206
Страница 1: ...2101510 rev AG NGC8206 Chromatograph User s Manual ...
Страница 14: ...xii Figure 6 3 AC Charger Power Supply Wiring 6 28 Figure 6 4 Communication Troubleshooting Flowchart 6 30 ...
Страница 27: ...Page 2 8 2101510 Rev AG Figure 2 4 NGC8206 Enclosure Figure 2 5 NGC8206 Enclosure Left Side ...
Страница 60: ...2101510 Rev AG Page 2 41 hex socket set screw on cap Figure 2 32 Explosion Proof AC Power Supply ...