![ABB i-bus KNX Room Master Premium RM/S 2.1 Скачать руководство пользователя страница 69](http://html.mh-extra.com/html/abb/i-bus-knx-room-master-premium-rm-s-2-1/i-bus-knx-room-master-premium-rm-s-2-1_product-manual_3076069.webp)
ABB i-bus
®
KNX
Commissioning
© 2008 ABB STOTZ-KONTAKT GmbH
67
The following parameters appear when
2 bit
is selected:
Contact position with end
of the forced operation
Options: ON
OFF
unchanged
calculate present contact position
This parameter determines the contact position of the relay after the
end of forced operation.
•
ON:
The output is switched ON after forced operation has ended
•
OFF:
The output is switched OFF after forced operation has
ended
•
unchanged:
The contact position is retained during forced
operation or safety priority.
The contact position only changes when a new calculated switch
value is received.
•
calculate present contact position:
After forced operation has
ended the value (switch value) is recalculated, the switch position
is recalculated and immediately initiated, i.e., the output continues
to operate normally in the background during forced operation.
The telegram value which is sent via the 2 bit communication object
determines the switch position as follows:
Valu
e
Bit 1 Bit 0
State
Description
0 0 0 Free
1 0 1 Free
If the communication object
Forced operation
receives a telegram with the value 0 (binary 00) or 1
(binary 01), the output is enabled and can be
actuated via different communication objects.
2 1 0 Forced
OFF
If the communication object
Forced operation
receives a telegram with the value 2 (binary 10),
the output of the Room Master is forced OFF and
remains disabled until forced operation is again
deactivated.
Actuation via another communication object is not
possible as long as the forced operation is activated.
The state of the output at the end of forced operation
can be programmed.
3 1 1 Forced
ON
If the communication object
Forced operation
receives a telegram with the value 3 (binary 11),
the output of the Room Master is forced ON and
remains disabled until forced operation is again
deactivated.
Actuation via another communication object is not
possible as long as the forced operation is activated.
Содержание i-bus KNX Room Master Premium RM/S 2.1
Страница 1: ...ABB i bus KNX Room Master Premium RM S 2 1 Intelligent Installation Systems ABB Product Manual ...
Страница 24: ...ABB i bus KNX Device technology 2008 ABB STOTZ KONTAKT GmbH 22 2 3 Dimension drawing 2CDC 072 054 F0008 ...
Страница 268: ......
Страница 275: ......