![ABB i-bus KNX Room Master Premium RM/S 2.1 Скачать руководство пользователя страница 261](http://html.mh-extra.com/html/abb/i-bus-knx-room-master-premium-rm-s-2-1/i-bus-knx-room-master-premium-rm-s-2-1_product-manual_3076261.webp)
ABB i-bus
®
KNX
Planning and application
© 2008 ABB STOTZ-KONTAKT GmbH
259
Valves
•
The purging cycle restarts if it was active before the failure.
•
The priorities blocking, forced operation, purging and adjustment are re-
established and executed as priorities.
The priorities are defined as follows:
1. Reference
movement
2. Communication
object
Block
3. Communication
object
Forced operation
4. Valve
Purge
5. Adjustment
6. Control
variables
Note
Here 1 corresponds to the highest priority.
•
The value parameterised for bus voltage recovery is only carried out if
no higher priority (with the exception of manual operation/reference run)
was active before the failure. If during bus voltage recovery and an
active priority a new
control value
is received, it will replace the
Control
value
which was defined in the parameterisation.
Shutter
The behaviour of the shutter/blind output is programmable.
The output can assume any state or remain unchanged.
Содержание i-bus KNX Room Master Premium RM/S 2.1
Страница 1: ...ABB i bus KNX Room Master Premium RM S 2 1 Intelligent Installation Systems ABB Product Manual ...
Страница 24: ...ABB i bus KNX Device technology 2008 ABB STOTZ KONTAKT GmbH 22 2 3 Dimension drawing 2CDC 072 054 F0008 ...
Страница 268: ......
Страница 275: ......