![ABB i-bus KNX Room Master Premium RM/S 2.1 Скачать руководство пользователя страница 52](http://html.mh-extra.com/html/abb/i-bus-knx-room-master-premium-rm-s-2-1/i-bus-knx-room-master-premium-rm-s-2-1_product-manual_3076052.webp)
ABB i-bus
®
KNX
Commissioning
© 2008 ABB STOTZ-KONTAKT GmbH
50
What is the debounce time?
If an edge is detected at an input, the input will react immediately to
this edge, e.g. by sending a telegram. At the same time, the duration
of the debounce time T
D
starts. The signal on the input is not
evaluated within the debounce time duration.
The following example clarifies this:
After detection of an edge on the input, further edges are ignored for
the debounce time T
D
.
Connected contact type
Options: closed
opened
Here you set if the contact on the input is a normally closed contact or
normally open contact.
Operating functionality of the shutter
Options:
1 push buttons (short = Lamella, long = Move)
1 push button (short = Move, long = Lamella)
1 push button (Move only - STOP)
1 switch operation (Move only)
2 push buttons (short = Lamella, long = Move)
2 switches (Move only)
2 push buttons (Move only)
2 push buttons (only Lamella)
T
D
T
D
T
D
Input signal
Detected pulse edge
Содержание i-bus KNX Room Master Premium RM/S 2.1
Страница 1: ...ABB i bus KNX Room Master Premium RM S 2 1 Intelligent Installation Systems ABB Product Manual ...
Страница 24: ...ABB i bus KNX Device technology 2008 ABB STOTZ KONTAKT GmbH 22 2 3 Dimension drawing 2CDC 072 054 F0008 ...
Страница 268: ......
Страница 275: ......