![ABB i-bus KNX Room Master Premium RM/S 2.1 Скачать руководство пользователя страница 130](http://html.mh-extra.com/html/abb/i-bus-knx-room-master-premium-rm-s-2-1/i-bus-knx-room-master-premium-rm-s-2-1_product-manual_3076130.webp)
ABB i-bus
®
KNX
Commissioning
© 2008 ABB STOTZ-KONTAKT GmbH
128
3.2.6.3.3 Parameter window
- Direct operation
This parameter window is visible if in parameter window
L, M, N, Fan
(3 x 6 A)
the option
yes
has been selected in the
Enable direct operatio
n
parameter.
Enable communication object
"Switch speed x" 1 bit
Options: no
yes
•
yes:
Three 1 bit communication objects
Speed 1
,
Speed 2
and
Speed 3
are enabled.
The Room Master receives a setting command via these communication
objects.
Telegram value 1 = Fan speed x is switched on
0 = Fan speed x is switched off
If several ON/OFF commands are received consecutively in a short period of
time at various
Fan speed 1-3
communication objects, the value last
received by the fan control is the decisive value. An OFF command to one of
the three communication objects,
Fan speed 1-3
, switches off the fan
completely.
Important
The forced operation remains valid and is considered.
The parameterised minimum dwell time in the fan speed for automatic
mode is ignored during manual operation. Accordingly, an immediate
reaction to the manual operation is detected.
The delay time with speed switch over remains active to protect the fan.
Содержание i-bus KNX Room Master Premium RM/S 2.1
Страница 1: ...ABB i bus KNX Room Master Premium RM S 2 1 Intelligent Installation Systems ABB Product Manual ...
Страница 24: ...ABB i bus KNX Device technology 2008 ABB STOTZ KONTAKT GmbH 22 2 3 Dimension drawing 2CDC 072 054 F0008 ...
Страница 268: ......
Страница 275: ......