![ABB i-bus KNX Room Master Premium RM/S 2.1 Скачать руководство пользователя страница 145](http://html.mh-extra.com/html/abb/i-bus-knx-room-master-premium-rm-s-2-1/i-bus-knx-room-master-premium-rm-s-2-1_product-manual_3076145.webp)
ABB i-bus
®
KNX
Commissioning
© 2008 ABB STOTZ-KONTAKT GmbH
143
3.2.7.1
HVAC System –
1 Control value/2 pipe
If option
1 Control value/2 pipe
is selected, additional parameters appear:
Valve COOLING independently usable
This parameter serves as a note or remark.
Valve COOLING
The cooling valve can be used additionally and independently via the
communication object
Control value COOLING (extra!)
. The valve
COOLING is not monitored in the process.
Valve HEATING
Via communication object
Control value HEATING/COOLING
the
valve HEATING and the fan are controlled.
For further information see:
Configuration of a HVAC system with Fan Coil units
page 237
Operation HEATING/COOLING after
bus voltage recovery
Options: unchanged
HEATING
COOLING
Using this parameter the reaction after bus voltage recovery is set.
•
unchanged:
After bus voltage recovery the state which existed before
bus voltage failure is re-established.
•
HEATING:
After bus voltage recovery the
HEATING
state is set.
•
COOLING:
After bus voltage recovery the
COOLING
state is set.
Содержание i-bus KNX Room Master Premium RM/S 2.1
Страница 1: ...ABB i bus KNX Room Master Premium RM S 2 1 Intelligent Installation Systems ABB Product Manual ...
Страница 24: ...ABB i bus KNX Device technology 2008 ABB STOTZ KONTAKT GmbH 22 2 3 Dimension drawing 2CDC 072 054 F0008 ...
Страница 268: ......
Страница 275: ......