106 Option
3. Phase order of main supply (MB input side) must be clockwise. The synchronization is
only possible if the drive run the motor with a clockwise rotating field. If the motor has
to run anti clockwise the phase order has to be changed directly at the motor.
Overview of installation work and check list
•
Mechanical installation was completed.
•
SBU and MAU free of pollution due to installation.
•
Power supply and signal cables for fans in transformer unit.
•
Converter control power supply must be 1-phase 230VAC.
•
Before closing the control power supply circuit breaker in MAU, measure the incoming
auxiliary supply voltage and verify that it is /-10% of its nominal value.
•
Auxiliary power, ground,
control and serial communication cables made properly.
•
Options (cabinet heater, CP610, etc.) supply cabling properly made.
•
Power cables for SBU functions are made and installed properly (including converter
output to MSS, MSS to motor, MB to motor, grid to MB).
•
Interface cables for SBU function (control device to ACS580MV) are properly made.
Insulation test
The insulation test is not recommended, if necessary check the description in
Download software
Marshalling PLC software
Marshalling PLC is optional, just for multi motor mode. As
described, take the loading package for the latest software release and
download to Marshalling PLC using thes same procedure as to AC500 of ACS580MV.
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...