78 Standard Commissioning Process
•
Observe and save the measurement, attach plot to report.
•
If the motor rotates in the opposite direction correct the motor cabling or change the
parameter 99.16 Phase order to UWV.
Fly start
If flystart is required by the project, do the below test, otherwise skip this step.
•
Take the drive to Local control by DriveStartup, select online mode.
Save and set following parameters:
a. 21.19 Scalar start mode to Automatic
b. 21.03 Stop mode to Coast
•
Set the speed reference to motor rated speed and start the motor. When motor
reaches the set point stop it and restart nearly 10s later.
•
Repeat the steps at different points as required, confirm the motor can be well found
and controlled.
•
Observe and save the measurement, attach plot to report.
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...