116 Option
•
Connect the Marshalling PLC and PC with Ethernet cable.
•
Open
http://192.168.0.10/webvisu.htm
by Internet Explorer to show Web visualization.
•
Input service level pass code in Par.24.
Marshalling PLC
parameter
Setting Description
Par.10 MSS close
time limit
3s
(example)
Define maximum operating time for closing MSS
Par.11 MB open
time limit
3s
(example)
Define maximum operating time for opening MB
Par.12 MSS open
time limit
3s
(example)
Define maximum operating time for opening MSS
Par.13 MSS close
waiting time
5s
(example)
Define the MSS operating waiting time, after switching off the motor.
Par.14 Motor grid
configure
External
(example)
Two grids are supported. This parameter defines the grid selection
command source.
External
means it’s from DI (X106: 1, 2).
Parameter
means it’s from
Motor1 grid selection
...
Motor8 grid
selection
.
Par.23 PLC IO
refresh
Done
(example)
In case PLC reports
F002 PLC IO configuration fault
,
refresh PLC configuration to match actual IO modules.
After refreshing, PLC will reboot and configure correct
hardware.
This parameter will be displayed only if PLC has IO
configuration fault.
Par.50 Motor 1
user set
UserSet1
(example)
This parameter selects the user set for this motor.
Two types of motors are supported and user set is used to select the
corresponding motor data. The command is from marshalling PLC to
BCU DI5, to select user set. Every time after Motor group 1...8
selection is set, marshalling PLC will select corresponding use set.
Detailed steps:
1. Using motor data 1 for commissioning.
2. Set
96.11 User set save/load
to
Save to set 1
. After saving is
finished, it will change to
No action
.
3. Set motor data 2 (
99.06
...
99.11
).
4. Set
96.11 User set save/load
to
Save to set 2
. After saving is
finished, it will change to
No action
.
5. Set
96.12 User set I/O mode in1
to
DI5
,
96.11 User set
save/load
to
User set I/O mode
.
96.10 User set status
will show
the user set selected by marshalling PLC.
Par.51 Motor 1
grid selection
External
(example)
This parameter selects the grid for this motor. It works only when
Par.
14 Motor grid configure
is
Parameter
.
Par.52 MB1 open
DOL enable
Disable
(example)
Parameter selects if MB1 open command is set if the direct online
(DOL) signal is removed (1
→
0).
Par.53 MB1 close
DOL enable
Disable
(example)
Parameter selects if MB1 close command is set if the direct online
(DOL) signal is set (0
→
1).
Set for motor 2 to
motor 8
if SBM>=0002
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...