Option 109
Below is an example (available when SBN=0001):
1. Confirm that the upper side phase order of MCB and MB1 are clockwise (customer’s
responsibility);
2. Disconnect the motor cable at the motor side;
3. Short-circuit both the input cable and output 3 phases cables of the VFD one by one;
4. Close MSS1 (in test position);
5. Check the underside phase order of MCB and MB1 with multimeter at measuring
points one by one. Make sure the phase order of this circuit is correct.
6. Check other main circuits phase order as the same procedure one by one (if
SBM>=0002)
Phase order check for PTs
1. Check the primary cable connection of PTs and make sure the phase order is correct.
2. Check the wirings connection between the secondary side of PTs and Rsyc-01 board.
Make sure the phase order is correct.
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...