142 Preventive Maintenance
Regular inspection
The following table contains an overview of the most relevant inspection checks for the
drive.
ABB recommends that inspections be carried out whenever the drive has been shut
down, i.e., to replace components or for any other field intervention.
1 Inspection and replacement of filter mats depend on the ambient air quality, i.e. dustiness, humidity. Monthly
filter inspection recommended, 3 months interval for filter replacement recommended.
Preventive replacement schedule
The following table highlights the recommended replacement intervals for drive
components, starting
from the completion date of the commissioning
²
.
2 The start date for the preventive replacement schedule is the commissioning completion
date or 2 years after delivery, whichever comes first.
Inspection action
Interval
[years]
Inspection
Type
Filter mats (replacement)
0.5¹
R
Power Module R1-R9
1
I or R
Transformer
1
I or R
Optical fibers
1
P
Cable connections, bolted connections
1
I
Dustiness, Corrosion and overheating
1
I
Software, hardware upgrades
2
I or P
Spare parts
2
P
Auxiliary voltage verification
1
I or P
Insulation test
4
P
Safety circuits
1
P
Isolator knife switch for Manual bypass
1
I or P
Contactor for auto bypass (Non ABB brand)
1
I or P
Contactor for auto bypass (ABB brand)
1
I or P
Years from commissioning
2
4
5
6
8
10
12
14
15
16
18
Cooling fans (no
redundancy)
R
R
R
R
Cooling fans (redundant
setup)
R
R
Power Module R1-R9
R
R
PCBA, power supplies
R
Control HW Batteries
R
R
R
UPS batteries
R
R
R
R
R
R
R
R
R
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...