76 Standard Commissioning Process
Note:
Parameter 83.10 is not the actual number of fans, but the standard number of fans if
redundant fan configured. Please refer to
2UBB005088_ACS580MV_3.3-11KV_Line-
up_overview
for standard fan configuration.
ACS580MV standard fan configuration
•
Test run the fan by setting the TEST RUN on parameter 83.12 Fan control. Check the
fan's direction of rotation.
a. For AC fan, if the direction is wrong, swap two phases of power supply and test
again.
b.
For EC fan, which have been programed and tested, contact MV Drives Supportline
if unusual problem occurs.
•
Measure the air pressure (parameter 1.35 INU air pressure), compare the value with
the record in factory test report. If the deviation is bigger than +/- 50 Pa, do the
following:
a. Check the fan operation.
b. Check the filter pads on the INU cabinet door.
c. Check the pressure sensor.
d. Check the air duct if present.
e. Check the condition of the electrical room.
Redundant
1200
1200
1200
2400
2400
2400
1200
6KV 25A INU and XFMR
1200
6KV 37.5A INU and XFMR
1200
6KV 50A INU and XFMR
1200
6KV 75A INU and XFMR
1200
6KV 100A INU and XFMR
1200
6KV 150A INU and XFMR
2400
6KV 200A INU and XFMR
2400
6KV 300A INU and XFMR
2400
6KV400A INU and XFMR
6KV
D560/D500 Fan box
687
O
46
0
600
110
0
600
110
0
600
1100
COU
COU
COU
600
1100
COU
600
1100
COU
600
110
0
COU
600
110
0
COU
600
1100
COU
600
1100
COU
600
1100
COU
600
110
0
COU
600
110
0
COU
600
1300
COU
600
130
0
600
130
0
600
1300
COU
COU
600
1300
600
1300
COU
COU
COU
Normal
D500
D500
2XD500
2XD500
D500
D500
2XD500
2XD500
D500
D500
2XD500
2XD500
D500
D560
2XD500
2XD560
D500
D560
2XD500
2XD560
D500
D560
2XD500
2XD560
2XD560
2XD560
3XD560
2XD560
2XD560
3XD560
2XD560
3XD560
( 6R1 )
( 6R2 )
( 6R3 )
( 6R4 )
( 6R5 )
( 6R6 )
( 6R7 )
( 6R8 )
( 6R9 )
G12
G12
G12
G12
G12
G22
G12
G12
G22
G12
G12
G22
G12
G12
G22
G12
G22
G12
G22
G32
G12
G22
G12
G22
G32
2600
2600
D560
G12
G22
1200
G12
G22
1200
1200
G12
G22
CN Market
current
rating
INU
TRU
6KV
ZA AC D500
ZA AC D560
ZA AC D500
ZA AC D560
R1
1
1
R2
1
1
R3
1
1
R4
1
1
R5
1
1
R6
1
1
R7
1
2
R8
2
2
R9
2
3
10KV
R1
1
1
R2
1
1
R3
1
1
1
R4
1
1
R5
1
2
R6
1
2
R7
2
2
R8
3
3
R9
3
3
2200
G11
2200
G21
G11
2200
G11
G21
G11
2200
2200
G11
2200
G21
G11
2200
2200
G11
G21
G11
G11
2200
G21
G11
2200
G21
G21
G11
G11
2400
G11
2400
G21
G11
G21
G11
G21
G11
2600
3XD560
2600
1600
1100
1300
1600
800
130
0
A
B
C
D
E
F
G
H
I
Roof Plate
J
1200
1100
O
460
O
460
O
460
O
460
O
46
0
O
460
O
460
2200
1100
O
460
O
460
2400
1100
O
460
O
460
O
460
O
460
1200
130
0
blocking plate
750
630
1000
130
0
O
460
G31
G31
1100
O
460
1200
Note
* D560 FAN is only suitable for 10R3 subframe D.
3XD560
G11
G21
G31
3200
4XD560
G11
G21
G31
G41
3200
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...