144 Preventive Maintenance
Motor insulation resistance
Insulation resistance measurement for motor, please refer to
.
Optical fibers
Visual check
Pay special attention to the following:
1. Cracks in the core or the coating.
2. Minimum bend radius (25 mm).
3. Condition of male and female connectors.
4. Installation across sharp edges.
5. Tightness of cable ties.
Attenuation measurement
1. Prepare the tools for attenuation measurement:
•
Tempo 253B light source (1)
•
Tempo 557B power meter (2)
•
10ZP adapter
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...