52 Standard Commissioning Process
Note:
If the error information like below, please new a folder named temp in drive C
.
•
Waiting nearly 25 seconds, programming successfully finished.
Press any key to exit.
•
Turn off the control power.
•
Remove the XILINX platform cable USB II.
Loading the IO controller (AC500eco) software
•
Save the following files and folders to the SD card (MC502) root folder. Files can be
found in the loading package (folder \04_IOController SW).
Note:
Only MC502 SD card can be used. This is not the same SD card which is plugged
into the BCU.
•
Switch off the control power
.
•
Install SD card adapter (MC503) into CPU PM55X.
•
Inset SD memory card (MC502) into adapter MC503.
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...