Standard Commissioning Process 77
•
Set the limitation in Parameter 83.32/34 INU air pressure low/high limit.
•
Check the below signals should be similar value to ambient temperature.
a.a
a. 1.31 Ambient temperature
b. 1.32 Trafo winding U1 temperature
c. 1.33 Trafo winding V1 temperature
d. 1.34 Trafo winding W1 temperature
•
If space heater is installed parameter 81.20 Space heater control should be activated
and test the function.
Motor first run
•
Connect the motor to drive. Let motor cooling, lubrication and protection system run if
present.
•
Take the drive to Local control by DriveStartup, select online mode.
Note:
If can’t set the speed reference by DriveStartup during the operation, try to
disconnect the USB cable in online mode and connect the cable again after the
DriveStartup announce the communication disturbing.
•
Press ON button on the front door, drive will be charged and fans will run.
•
Observe the motor behavior in the graph below. Start the motor to a low speed
reference (10% of nominal value) and check the rotation direction.
•
Increase the speed reference by 10% until nominal speed is reached, then decrease
the speed reference by 10% to 0.
Frame
Size
R1
R2
R3
R4
R5
R6
3.3/4.16kV
R6
R7
R8
R9
3.3/4.16kV
R9
Low
Limit
83.32
100
100
150
100
100
200
150
100
200
200
150
High
Limit
83.34
800
800
800
800
800
800
800
800
800
800
800
NOTICE
Make sure you set all motor parameters and check the motor area. Nobody
and nothing should be touching the shaft or the fan when you run the motor or even
stand too close to it.
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...