104 Option
Check of the logic and lamp status
For lamp test, the cabinet shall be fed Auxiliary supply, and close Q7601 and Q7651. The
lamps status can be checked as below table.
Check of the humidity sensor and space heater
•
For this test, the cabinet should be fed Auxiliary supply, and close Q7651.
•
Adjust the setting of the humidity sensor A7651(B7651) to an appropriate value, which
is nearby the ambient humidity, and the indicator lamp of the sensor should be on, the
space heater E7651 shall be powered on and start to work.
Once passed the test, adjust the setting of sensor A7651(B7651) to
75
.
Check of the MBU logic with the drive
•
Confirm the MCB is at the test position, switch the S7804 to ‘Local mode’, set to the
‘VSD mode’. Close the MCB by drive.
•
Confirm the MCB is at the test position, switch the S7804 to ‘Remote mode’, set to the
‘VSD mode’. Close the MCB by drive.
•
Confirm the MCB is at the test position, switch the S7804 to ‘Local mode’, set to the
‘Bypass mode’. Close the MCB by overriding system.
•
Confirm the MCB is at the test position, switch the S7804 to ‘Remote mode’, set to the
‘Bypass mode’. Close the MCB by overriding system.
•
Rack in the MCB to the operation position. From this time on the medium voltage can
be connect to the MBU and drive.
•
Confirm the MCB is open, switch the S7804 to ‘Remote mode’ or ‘Local mode’, set to
the ‘VSD mode’, monitor and run the motor by the drive.
Item
KM1(Q1)
open,
KM2(Q2)
open,
KM3(Q3)
close
Bypass mode
KM1(Q1) open,
KM2(Q2) open,
KM3(Q3) open
OFF mode
KM1(Q1)
close,
KM2(Q2)
open,
KM3(Q3)
open
KM1(Q1)
close,
KM2(Q2)
close,
KM3(Q3) open
VSD mode
Result
Aux Supply lamp
On
On
On
On
KM1(Q1)_close
lamp
Off
Off
On
On
KM1(Q1)_open lamp
On
On
Off
Off
KM2(Q2)_close lamp
Off
Off
Off
On
KM2(Q2)_open lamp
On
On
On
Off
KM3(Q3)_close lamp
On
Off
Off
Off
KM3(Q3)_open lamp
Off
On
On
On
VSD mode lamp
Off
Off
Off
On
Bypass mode lamp
On
Off
Off
Off
QF1 close lamp
QF1 open lamp
On: connected X310:3,4
Off: disconnected X310:3,4
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...